Taichung City farmland pollution control site appropriate measures to improve the plan - Longjing, Dali and other four areas to improve farmland - supervision and verification work

Absrtact
The main tasks of the project include supervising, verification and providing technical support for the “Pollution Improvement Project for The Farmland soil Pollution Control Site in the Longjing, Tali ,Wufeng and Tachia area” The project period is from April 18, 2016 to August 17, 2017. We have played a fair role in supervising the Improvement of the heavy metal pollutes soil sites to meet the standard. There are 9.5307 ha of polluted farmland to be cleaned up, including 61 mounds and J646 landlords have been improved finish. The practical implementation of this plan improved to 60 mounds handle the sale and acceptance. The improvement company began to work at the June 28, 2016, the plan during the improvement of the staff were full supervision.In this project, a total of 60 pond block pollution improvement verification operations were carried out. A total of three ponds did not pass the first pollution improvement verification. After the second verification results have been improved by pollution improvement. The results of the survey were all lower than half of the agricultural land monitoring standard.
Keyword
supervising, verification, soil Pollution Control Site
Open
top